Наверх

News

Industrial facilities of Svyaztransneft, JSC have been fully prepared to the flood period

Industrial facilities of Svyaztransneft, JSC have been fully prepared to the spring flood of 2016. As part of the measures on preparing oil pipeline transportation communication facilities and communications installations to stable work during the spring flood, the enterprise established a committee headed by Igor Khalatov, Deputy Chief Engineer for Engineering; it coordinates activities of flood control committees of 13 branches of Svyaztransneft, JSC. Besides, a plan of readiness of communication facilities to work during the spring flood has been developed and approved.

Svyaztransneft, JSC has finished technical upgrading of communication network at earthquake-prone sections of ESPO (Eastern Siberia-Pacific Ocean) pipeline

Baikal Region branch of Svyaztransneft, JSC (Bratsk) has finished construction of a communication network for integration of control and monitoring stations (CMS) into the existing communication network at earthquake-prone sections (more than eight points) of the Eastern Siberia-Pacific Ocean (ESPO) oil trunk pipeline. The works were conducted as part of the Technical Upgrading and Revamping Program of Svyaztransneft, JSC.