Наверх

News

Svyaztransneft, JSC connected control and monitoring stations of Voskresenka - Priboy petroleum products pipeline to the communication system of Transneft Druzhba, JSC Svyaztransneft, JSC connected control and monitoring stations of Voskresenka - Priboy petroleum products pipeline to the communication system of Transneft Druzhba, JSC

Middle Volga Industrial Communication Directorate of Svyaztransneft (Samara) has commissioned three offshoots from Samara - Nikolskoe - Bryansk - border of the Republic of Belarus fibre-optic communications link (FOCL) at the section between communications centres Lopatino - Lyubetskaya - Pokrovka. It allowed connecting control and monitoring stations of Voskresenka - Priboy petroleum products trunk pipeline to the pipeline telemetry (PT) communication system of Transneft Druzhba.

Middle Ob branch of Svyaztransneft finished revamping of the engineering communication system of Noyabrsk and Surgut Directorates of Transneft Siberia

Middle Ob branch of Svyaztransneft (Surgut) finished construction and assembly works as part of revamping of the industrial-engineering communication (IEC) system of Noyabrsk and Surgut Oil Trunk Pipeline Directorates (OTPD) of Transneft Siberia. Construction has been performed in Khanty-Mansi Autonomous Area - Yugra and Yamalo-Nenets Autonomous Area since October 2016 in accordance with the communication network technical upgrading and revamping programme of Svyaztransneft.

The Far Eastern Branch of Svyaztransneft, JSC commissioned a new communications center for extension of ESPO PS-2

The Far Eastern Branch of Svyaztransneft (Khabarovsk) commissioned a new communications center in the territory of Oil Pump Station No. 29 (OPS) of Transneft Far East. The communications center was built to the extent of implementation of the project of extension of the delivery capacity of Eastern Siberia – Pacific Ocean Pipeline System (ESPO PS) up to 50 million tons at the section Skovorodino OPS – Kozmino Port.
 

Western Siberian branch of Svyaztransneft finished construction of the first phase of the mobile radio communications system of Tyumen OTPD (Oil Trunk Pipeline Directorate)

Western Siberian branch of Svyaztransneft (Tyumen) finished construction of the first phase of the mobile radio communications system of TETRA standard at the section between Chashi - Tyumen communications centres of Ust-Balyk - Kurgan - Ufa - Almetievsk, Nizhnevartovsk - Kurgan - Kuybyshev oil trunk pipelines and Tyumen - Yurgamysh petroleum products pipeline.

Svyaztransneft Held the Final Stage of the First Round of the Second Global Scientific and Technical Youth Conference

Svyaztransneft completed the final stage of the first round of the Second Global Scientific and Technical Youth Conference (STYC) of Transneft and the International Association of Oil Transporters member companies. The event was held in the electrical communications workshop No. 6, the Upper Volga Branch (St. Petersburg) and involved 16 young professionals from the Company’s branches and the administration.